As the consequence of rapid development of Indonesia in the last decades, nowadays electricity has become an essential needs of most Indonesian. There is a huge demand of electricity in Indonesia and it still increasing.

Hydroelectric Power Generation is the most efficient and environmental friendly way to transfer energy into electricity. We believe there will be still many Hydroelectric Power Plants to be constructed in Indonesia because most water resources are not yet explored or exploited.

We offer our service in preparing and constructing Micro-, Mini- and Hydroelectric Power Plants.

We normally divide our services in three phases :

Phase I
  Consists of putting data together in a feasibility study report.
Phase II
  Is the finalization of the technical details of the project and will mostly be   oriented towards commercial aspects for bringing the project to a financial   closing.
Phase III
  Is the project implementation.

Our experts would start the project with a feasibility study, hydrology study and geological investigation. Afterwards we will optimize and determine all related hydroelectric works considering environmental, social and gender issues. If an optimal variant is found, power production could be estimated.
Design and cost estimation then will be exercised. We could then estimate total investment for the project and also set a realistic construction schedule.

When the technical aspects are solved and the investment is known then the financial analysis of the project follows as the next task. Depends on financial assumptions (eg. equity-debt ratio, interest rate, price of electricity per kWh, amortization period, inflation rate, etc), the internal rate of return of the project can be determined.

Beside assisting the owner in the commercial aspects, we will take care that the owner is aware of technical and legal risks.

As it is common in our service, we will supervise the construction and be involved in commissioning the plant. By the end of the day we are proud to see a profitable power plant producing electricity from natural resource which is supplying more Indonesian enough electricity for a bright life.

Copyright (C) 2001. PT Frisa Mulia Indonesia. All rights reserved.
Jl. K.H. Wahid Hasyim No. 137G 2nd Floor
Jakarta 10240, Indonesia
Phone : (62-21) 3910705 ; 3910720
Fax : (62-21) 3928092
Building Construction Incinerator Station Water / Waste Water Treatment Plant Road Construction Food Processing Plant Hydrolic Asphalt Engineering Education Consultant